Skip to content
From Cutting Tool Engineering

Tool Testing Done Right

Cutting tool tests performed by vendors are an excellent resource, and I've used them many times.

July 15, 2009By Michael Deren

Cutting tool tests performed by vendors are an excellent resource, and I’ve used them many times. They can help your shop accomplish the following:

  • compare vendors,
  • reduce cutting tool costs,
  • reduce machining cycle times, and
  • expand its cutting tool knowledge base.

To make use of this excellent resource, you need to make appointments for the tests with the vendors, have specific projects in mind and allocate the time required to perform the tests. Vendors need to fully understand your application, ship or bring the tools and perform the testing. This may sound simple, but the devil is in the details.

By making an appointment with your vendor, you and the vendor agree on a specific time and place to perform the tests. You will have discussed the project and its goals. It is your responsibility to allocate machine time. This includes the toolholders, work materials and fixtures required for the tests and the personnel to run the machine. Usually, I try to have these resources ready before the vendor comes in, but to tell the truth I have sometimes been guilty of not being fully prepared—not always through my own fault, though!

The vendor is responsible for shipping the cutting tools ahead of time or bringing them on the day of the testing. If any toolholders are required that you don’t have, the vendors should ship or bring them as well. You, however, should have the required retention knobs for the toolholders. In the case of indexable cutting tools, the vendor should also bring the proper wrenches to load the inserts and backup tools, just in case a cutter fails.

Not too long ago, I scheduled a cutting tool test with a vendor for about 1 p.m. The vendor came in, cutting tools in hand. Unfortunately, a job ran late on the machine we were going to use. We tried to tear down and set up as quickly as possible, but it was 3 p.m. before we were ready to start testing. The shift ended at 3:30 p.m., so we had to cancel the test. I felt bad, knowing I had wasted my vendor’s time that afternoon. I apologized and rescheduled for the next morning. The vendor brought his first choice of tooling along with a second choice should the first one fail. We had a productive and successful test.

Finish task to continue reading

Review the print ads from this magazine to continue

This quick advertiser review unlocks the rest of the article and keeps the full-screen reader focused on the ads instead of the page chrome.

MFGAxis MFGAxis Discussion Be part of the shop-floor conversation Like, save, or comment on this CTE story.
Be the first to engage.

MFGAxis Discussion

Be the first to engage.
Scroll for the next article