After being packed into 11 crates and travelling from Neuhausen, Germany to Baltimore by boat, and onto its final destination by truck back in December, a 20-foot-long, 135,000 lb. industrial machine from Zimmermann was moved into place over the course of several hours at the Connecticut Center for Advanced Technology.